+2
    
    
    
        
        
        Completed
        
        
    
    
    
    
    
    Individual Scheduler Pausing
Currently to pause a schedule for an connector you have to either disable the connector or delete the schedule for that connector.
Sometimes you want to stop the schedule for one specific connector, but still be able to run the connector. Would it be possible to add in a pause option for individual schedules per connector rather than the overall schedule?
Customer support service by UserEcho
	
                
Thanks Matthew. There was already a item on the backlog for this, so I linked back to here.
Available in 5.2.1